In December 2023, the shell (material 321) sent to Russia. According to the Russian intergranular corrosion standard GOST 6032-2003

In December 2023, the shell (material 321)  sent to Russia. According to the Russian intergranular corrosion standard GOST 6032-2003, this shell will ultimately be installed in a nuclear power plant in Taiwan and will be used for the circulation of cooling water in the power plant.

 

Created on:2024-11-27 14:06
PV:0
Home    In December 2023, the shell (material 321) sent to Russia. According to the Russian intergranular corrosion standard GOST 6032-2003